1
GATE ME 1995
Subjective
+2
-0
On the average $$100$$ customers arrive at a place each hour, and on the average the server can process $$120$$ customers per hour. What is the proportion of time the server is idle?
2
GATE ME 1995
MCQ (Single Correct Answer)
+1
-0.3
The manufacturing area of a plant is divided into four quadrants. Four machines have to located one in each quadrant. The total number of possible layouts is
A
$$4$$
B
$$8$$
C
$$16$$
D
$$24$$
3
GATE ME 1995
Subjective
+2
-0
GATE ME 1995 Industrial Engineering - Production Planning and Control Question 4 English
4
GATE ME 1995
Subjective
+1
-0
Match the following:
List-$${\rm I}$$
(A) Worm gears
(B) Cross helical gears
(C) Bevel gears
(D) Spur gears

List-$${\rm I}{\rm I}$$
1. Parallel shafts
2. Non-parallel, intersecting shafts
3. Non-parallel, non-intersecting shafts
4. Large speed ratios