1
GATE ME 2015 Set 2
MCQ (Single Correct Answer)
+2
-0.6
The total emissive power of a surface is $$500$$ $$W/{m^2}$$ at a temperature $${T_1}$$ and $$1200$$ $$W/{m^2}$$ at a temperature $${T_2}$$, where the temperatures are in Kelvin. Assuming the emissivity of the surface to be constant, the ratio of the temperatures $${{{T_1}} \over {{T_2}}}$$ is
A
$$0.308$$
B
$$0.416$$
C
$$0.803$$
D
$$0.874$$
2
GATE ME 2015 Set 2
MCQ (Single Correct Answer)
+2
-0.6
A balanced counter-flow heat exchanger has a surface area of $$20\,\,{m^2}$$ and overall heat transfer coefficient of $$20$$ $$W/{m^2}$$-$$K$$. Air $$\left( {{C_p} = 1000J/kg - K} \right)$$ entering at $$0.4$$ $$kg/s$$ and $$280$$ $$K$$ is to preheated by the air leaving the system at $$0.4$$ $$kg/s$$ and $$300$$ $$K.$$ The outlet temperature (in $$K$$) of the preheated air is
A
$$290$$
B
$$300$$
C
$$320$$
D
$$350$$
3
GATE ME 2015 Set 2
Numerical
+1
-0
Annual demand of a product is $$50,000$$ units and the ordering cost is Rs. $$7,000$$ per order. Considering the basic economic order quantity model, the economic order quantity is $$10,000$$ units. When the annual inventory cost is minimized, the annual inventory holding cost (in Rs.) is ___________
Your input ____
4
GATE ME 2015 Set 2
Numerical
+2
-0
A project consists of $$7$$ activities. The network along with the time durations (in days) for various activities is shown in the figure. GATE ME 2015 Set 2 Industrial Engineering - Pert and Cpm Question 10 English

The minimum time (in days) for completion of the project is _____________

Your input ____
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12