1
GATE ME 2014 Set 2
Numerical
+2
-0
Consider the following data with reference to elementary deterministic economic order quantity model GATE ME 2014 Set 2 Industrial Engineering - Inventory Control Question 13 English

The total number of economic orders per year to meet the annual demand is _______________.

Your input ____
2
GATE ME 2014 Set 2
Numerical
+2
-0
A project has four activities $$P,Q, R$$ and $$S$$ as shown below. GATE ME 2014 Set 2 Industrial Engineering - Pert and Cpm Question 14 English

The normal cost of the project is Rs. $$10,000/-$$ and the overhead cost is Rs. $$200/-$$ per day. If the project duration has to be crashed down to $$9$$ days, the total cost (in Rupees) of the project is ______________.

Your input ____
3
GATE ME 2014 Set 2
MCQ (Single Correct Answer)
+1
-0.3
If there are $$m$$ sources and $$n$$ destinations in a transportation matrix, the total number of basic variables in a basic feasible solution is
A
$$m+n$$
B
$$m+n+1$$
C
$$m+n-1$$
D
$$m$$
4
GATE ME 2014 Set 2
MCQ (Single Correct Answer)
+1
-0.3
A component can be produced by any of the four processes $${\rm I},$$ $${\rm II},$$ $${\rm III},$$ and $${\rm IV}$$. The fixed cost and the variable cost for each of the processes are listed below. The most economical process for producing a batch of $$100$$ pieces is GATE ME 2014 Set 2 Industrial Engineering - Production Planning and Control Question 7 English
A
$${\rm I}$$
B
$${\rm I}$$$${\rm I}$$
C
$${\rm I}$$$${\rm I}$$$${\rm I}$$
D
$${\rm IV}$$
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering