1
GATE ME 2002
MCQ (Single Correct Answer)
+2
-0.6
The time taken to drill a hole though a $$25$$ $$mm$$ thick plate with the drill rotating at $$300$$ $$rpm$$ and moving at a feed rate of $$0.25$$ $$mm$$/revolution is
A
$$10$$ $$sec$$
B
$$20$$ $$sec$$
C
$$60$$ $$sec$$
D
$$100$$ $$sec$$
2
GATE ME 2002
MCQ (Single Correct Answer)
+1
-0.3
Hot rolling of mild steel is carried out
A
at recrystallisation temp
B
between $$100C$$ to $$150C$$
C
below recrystallisation temp
D
above recrystallisation temp
3
GATE ME 2002
MCQ (Single Correct Answer)
+1
-0.3
Machining of complex shapes on $$CNC$$ machines requires
A
simultaneous control of $$x, y, $$ and $$z$$ axes
B
simultaneous control of $$x,$$ and $$y$$ axes
C
independent control of $$x$$ and $$Y$$ axes
D
independent control of $$x, y$$ and $$z$$ axes
4
GATE ME 2002
MCQ (Single Correct Answer)
+1
-0.3
The primary purpose of a sprue in a casting mold is to
A
Feed the casting at a rate consistent with the rate of solidification
B
Act as a reservoir for molten metal
C
Feed molten metal from the pouring basin to the gate
D
Help feed the casting until all solidification takes place
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12