1
GATE EE 1995
Fill in the Blanks
+2
-0
The rated load of an underground cable is always _______its natural load.
2
GATE EE 1995
MCQ (Single Correct Answer)
+1
-0.3
In order to have a lower cost of electrical energy generation,
A
The load factor and diversity factor should be low
B
The load factor should be low but diversity factor should be high
C
The load factor should be high but diversity factor should be low
D
The load factor and diversity factor should be high
3
GATE EE 1995
Fill in the Blanks
+1
-0
The positive sequence component of the voltage at the point of fault in a power system is zero for a _________fault.
4
GATE EE 1995
Subjective
+5
-0
The inductance and capacitance of a power system network upto a circuit breaker location are $$1H$$ and $$0.01$$ $$\mu F$$ respectively, the value of the shunt resistor across the circuit breaker, required for critical damping of the restriking voltage is