Demand during lead time with associated probabilities is shown below: GATE ME 2014 Set 4 Industrial Engineering - Inventory Control Question 28 English

Expected demand during lead time is ___________

Your input ____
2
GATE ME 2014 Set 4
MCQ (Single Correct Answer)
+2
-0.6
The precedence relations and duration (in days) of activities of a project network are given in the table. The total float (in days) of activities $$e$$ and $$f,$$ respectively, are GATE ME 2014 Set 4 Industrial Engineering - Pert and Cpm Question 12 English
A
$$0$$ and $$4$$
B
$$1$$ and $$4$$
C
$$2$$ and $$3$$
D
$$3$$ and $$1$$
3
GATE ME 2014 Set 4
Numerical
+2
-0
At a work station, $$5$$ jobs arrive every minute. The mean time spent on each job in the work station is $$1/8$$ minute. The mean steady state number of jobs in the system is __________
Your input ____
4
GATE ME 2014 Set 4
Numerical
+2
-0
A shaft is subjected to pure torsional moment. The maximum shear stress developed in the shaft is $$100$$ $$MPa.$$ The yield and ultimate strengths of the shaft material in tension are $$300$$ $$MPa$$ and $$450$$ $$MPa,$$ respectively. The factor of safety using maximum distortion energy (Von - Mises) theory is __________.
Your input ____
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12