1
GATE ME 2014 Set 4
Numerical
+1
-0
Demand during lead time with associated probabilities is shown below: GATE ME 2014 Set 4 Industrial Engineering - Inventory Control Question 24 English

Expected demand during lead time is ___________

Your input ____
2
GATE ME 2014 Set 4
MCQ (Single Correct Answer)
+2
-0.6
The precedence relations and duration (in days) of activities of a project network are given in the table. The total float (in days) of activities $$e$$ and $$f,$$ respectively, are GATE ME 2014 Set 4 Industrial Engineering - Pert and Cpm Question 10 English
A
$$0$$ and $$4$$
B
$$1$$ and $$4$$
C
$$2$$ and $$3$$
D
$$3$$ and $$1$$
3
GATE ME 2014 Set 4
Numerical
+2
-0
At a work station, $$5$$ jobs arrive every minute. The mean time spent on each job in the work station is $$1/8$$ minute. The mean steady state number of jobs in the system is __________
Your input ____
4
GATE ME 2014 Set 4
Numerical
+2
-0
A shaft is subjected to pure torsional moment. The maximum shear stress developed in the shaft is $$100$$ $$MPa.$$ The yield and ultimate strengths of the shaft material in tension are $$300$$ $$MPa$$ and $$450$$ $$MPa,$$ respectively. The factor of safety using maximum distortion energy (Von - Mises) theory is __________.
Your input ____