1
GATE ME 2000
Subjective
+5
-0
Given below are the data for a project network. GATE ME 2000 Industrial Engineering - Pert and Cpm Question 4 English
(a) Draw the network for the above project capturing the precedence relationships.
(b) Find the critical path and its duration.
2
GATE ME 2000
MCQ (Single Correct Answer)
+2
-0.6
In a time series forecasting model, the demand for five time periods was $$10, 13,$$ $$15,$$ $$18$$ and $$22.$$ A linear regression fit resulted in an equation $$F = 6.9 + 2.9$$ $$t$$ where $$F$$ is the forecast for period $$t$$. The sum of absolute deviations for the five data is
A
$$2.2$$
B
$$0.2$$
C
$$-1.2$$
D
$$24.3$$
3
GATE ME 2000
MCQ (Single Correct Answer)
+2
-0.6
In a single server infinite population queuing model, arrivals follow a Poisson distribution with mean $$\lambda = 4$$ per hour. The service times are exponential with mean service time equal to $$12$$ minutes. The expected length of the queue will be
A
$$4$$
B
$$3.2$$
C
$$1.25$$
D
$$24.3$$
4
GATE ME 2000
Subjective
+5
-0
Solve the following linear programming problem by simplex method

$$\eqalign{ & Maximize\,\,\,\,\,\,4{x_1} + 6{x_2} + {x_3} \cr & Subject\,\,to\,\,\,\,\,\,2{x_1} - {x_2} + 3{x_3}\, \le 5 \cr & \,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,{x_1},{x_2},{x_3} \ge 0 \cr} $$

$$(a)$$$$\,\,\,\,\,\,\,$$ What is the solution to the above problem?

$$(b)$$$$\,\,\,\,\,\,\,$$ Add the constant $${x_2} \le 2$$ to the simplex table of part $$(a)$$ and find the solution.

EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12