1
GATE ME 1996
MCQ (More than One Correct Answer)
+1
-0.3
Preheating before welding is done to
A
Make the steel softer
B
Burn away oil, grease, etc., from the plate surface
C
Prevent cold cracks
D
Prevent plate distortion
2
GATE ME 1996
Subjective
+2
-0
GATE ME 1996 Production Engineering - Welding Process Question 28 English
3
GATE ME 1996
Subjective
+5
-0
The cross section weld bead is shown in fig the profile of the bead and the fusion zone are taken circular for convenience. Bead width and radii of curvature of circular profiles are given in fig. The bead height and depth of penetration are GATE ME 1996 Production Engineering - Welding Process Question 2 English
4
GATE ME 1996
MCQ (Single Correct Answer)
+5
-1.5
Tool life of a $$10$$ hours is obtained when cutting with a single point tool at $$63m/min.$$ If Taylor's constant $$C=257.35,$$ tool life on doubling the velocity will be
A
$$5$$ hours
B
$$25.7$$ $$min$$
C
$$38.3$$ $$min$$
D
unchanged