Service workshop has four jobs on hand to be processed. The date and processing time for each of the jobs are given below GATE ME 1990 Industrial Engineering - Scheduling Question 3 English

Considering mean lateness and mean flow time, evaluate the shortest-time rule and least-slack rule and recommend the desirable rule.

2
GATE ME 1990
MCQ (Single Correct Answer)
+1
-0.3
The process of shot peening increases the fatigue life of steel springs mainly because it results in
A
surface hardening
B
increased stiffness of the material
C
structural changes in the material
D
residual compression at the surface
3
GATE ME 1990
MCQ (Single Correct Answer)
+1
-0.3
The pressure at the in-gate will be maximum with the gating system
A
$$4:8:3$$
B
$$1:3:3$$
C
$$1:2:4$$
D
$$1:2:1$$
4
GATE ME 1990
MCQ (Single Correct Answer)
+1
-0.3
Penetration is increased by
A
Increasing welding current and welding speed
B
Increasing welding current and decreasing welding speed
C
Decreasing welding current and welding spped
D
Decreasing welding current and increasing welding speed