1
GATE EE 2015 Set 1
MCQ (Single Correct Answer)
+2
-0.6
A sustained three phase fault occurs in the power system shown in the figure. The current and voltage phasors during the fault (on a common reference), after the natural transients have died down, are also shown. Where is the fault located? GATE EE 2015 Set 1 Power System Analysis - Symmetrical Components and Symmetrical and Unsymmetrical Faults Question 13 English
A
Location $$P$$
B
Location $$Q$$
C
Location $$R$$
D
Location $$S$$
2
GATE EE 2015 Set 1
Numerical
+2
-0
Consider the economic dispatch problem for a power plant having two generating units. The fuel costs in $$Rs/MWh$$ along with the generation limits for the two units are given below:
$$\eqalign{ & {C_1}\left( {{P_1}} \right) = 0.01\,P_1^2 + 30{P_1} + 10; \cr & \,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,100\,MW \le {P_1} \le 150\,MW \cr} $$
$$\eqalign{ & {C_2}\left( {{P_2}} \right) = 0.05\,P_2^2 + 10{P_2} + 10; \cr & \,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,\,100\,MW \le {P_2} \le 180\,MW \cr} $$

The incremental cost (in $$Rs/MWh$$) of the power plant when it supplies $$200$$ $$MW$$ is __________.

Your input ____
3
GATE EE 2015 Set 1
MCQ (Single Correct Answer)
+1
-0.3
Base load power plants are
$$P.$$ wind farms
$$Q.$$ run-of-river plants
$$R.$$ nuclear power plants
$$S.$$ diesel power plants
A
P, Q and S only
B
P, R and S only
C
P, Q and R only
D
Q and R only
4
GATE EE 2015 Set 1
MCQ (Single Correct Answer)
+2
-0.6
Determine the correctness or otherwise of the following Assertion (a) and the Reason (R).
Assertion (A): Fast decoupled load flow method gives approximate load flow solution because it uses several assumptions.
Reason (R): Accuracy depends on the power mismatch vector tolerance.
A
Both (A) and (R) are true and (R) is the correct reason for (A)
B
Both (A) and (R) are true but (R) is not the correct reason for (A)
C
Both (A) and (R) are false
D
(A) is false and (R) is true
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12