For a small project with five jobs, the following data is given GATE ME 1993 Industrial Engineering - Pert and Cpm Question 5 English
(i) Draw the project network in activity on arc mode
(ii) Under $$PERT$$ assumptions, determine the distribution of project duration.
2
GATE ME 1993
MCQ (Single Correct Answer)
+1
-0.3
The outside diameter of a hollow shaft is twice its inside diameter. The ratio of its torque carrying capacity to that of a solid shaft of the same material and the same outside diameter is
A
$$15/16$$
B
$$3/4$$
C
$$1/2$$
D
$$1/16$$
3
GATE ME 1993
MCQ (Single Correct Answer)
+1
-0.3
The yield strength of a steel shaft is twice its endurance limit. Which of the following torque fluctuations represent the most critical situation according to Soderberg criterion?
A
$$-T$$ to $$+T$$
B
$$-T/2$$ to $$+T$$
C
$$0$$ to $$+T$$
D
$$+T/2$$ to $$+T$$
4
GATE ME 1993
MCQ (More than One Correct Answer)
+1
-0.3
Centrifugally casted products have
A
Large grain structure with high porosity
B
Fine grain structure with high density
C
Fine grain structure with low density
D
Segregation of slug towards the outer skin of the casting
EXAM MAP
Medical
NEET
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
CBSE
Class 12