1
GATE ME 1992
MCQ (Single Correct Answer)
+1
-0.3
A condenser of a refrigeration system rejects heat at a rate of $$120$$ $$kW,$$ while its compressor consumes a power of $$30$$ $$kW.$$ The coefficient of performance of the system would be
A
$$1/4$$
B
$$4$$
C
$$1/3$$
D
$$3$$
2
GATE ME 1992
Subjective
+5
-0
A Hydro turbine is required to give $$25$$ $$MW$$ at $$50$$ $$m$$ head and $$90$$ $$rpm$$ runner speed. The laboratory facilities available, permit testing of $$20$$ $$kW$$ models at $$5$$ $$m$$ head. What should be the model runner speed and model to prototype scale ratio?
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12