1
GATE ME 1992
MCQ (Single Correct Answer)
+2
-0.6
In stream and other vapor cycles, the process of removing non-condensables is called
2
GATE ME 1992
MCQ (Single Correct Answer)
+2
-0.6
Boiler rating is usually defined in terms of:
3
GATE ME 1992
MCQ (Single Correct Answer)
+1
-0.3
A condenser of a refrigeration system rejects heat at a rate of $$120$$ $$kW,$$ while its compressor consumes a power of $$30$$ $$kW.$$ The coefficient of performance of the system would be
4
GATE ME 1992
Subjective
+5
-0
A Hydro turbine is required to give $$25$$ $$MW$$ at $$50$$ $$m$$ head and $$90$$ $$rpm$$ runner speed. The laboratory facilities available, permit testing of $$20$$ $$kW$$ models at $$5$$ $$m$$ head. What should be the model runner speed and model to prototype scale ratio?
Paper analysis
Total Questions
Engineering Mechanics
1
Fluid Mechanics
1
Heat Transfer
2
Machine Design
4
Production Engineering
14
Strength of Materials
2
Theory of Machines
1
Thermodynamics
6
Turbo Machinery
1
More papers of GATE ME
GATE ME 2024
GATE ME 2023
GATE ME 2022 Set 2
GATE ME 2022 Set 1
GATE ME 2020 Set 2
GATE ME 2020 Set 1
GATE ME 2019 Set 1
GATE ME 2019 Set 2
GATE ME 2018 Set 2
GATE ME 2018 Set 1
GATE ME 2017 Set 1
GATE ME 2017 Set 2
GATE ME 2016 Set 2
GATE ME 2016 Set 3
GATE ME 2016 Set 1
GATE ME 2015 Set 2
GATE ME 2015 Set 1
GATE ME 2015 Set 3
GATE ME 2014 Set 4
GATE ME 2014 Set 2
GATE ME 2014 Set 1
GATE ME 2014
GATE ME 2014 Set
GATE ME 2014 Set 3
GATE ME 2013
GATE ME 2012
GATE ME 2011
GATE ME 2010
GATE ME 2009
GATE ME 2008
GATE ME 2007
GATE ME 2006
GATE ME 2005
GATE ME 2004
GATE ME 2003
GATE ME 2002
GATE ME 2001
GATE ME 2000
GATE ME 1999
GATE ME 1998
GATE ME 1997
GATE ME 1996
GATE ME 1995
GATE ME 1994
GATE ME 1993
GATE ME 1992
GATE ME 1991
GATE ME 1990
GATE ME 1989
GATE ME 1988
GATE ME 1987
GATE ME
Papers
2024
2023
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
1989
1988
1987