1
GATE ME 1989
MCQ (Single Correct Answer)
+2
-0.6
Two cubical castings of the same metal and sizes of $$2cm$$ side and $$4cm$$ side are moulded in green sand. If the smaller casting solidifies in $$2mins,$$ the expected time of solidifications of larger casting will be
A
$$16$$ $$min$$
B
$$2\sqrt 8 $$ min
C
$$8$$ min
D
$$4$$ min
2
GATE ME 1989
Subjective
+5
-0
An arc welding $$DC$$ power source has a linear power source characteristic with open circuit voltage $${V_O} = \,\,80$$ volts and short circuit current $${{\rm I}_S} = 1000amps.$$ The voltage-length characteristic of the arc is given by $$V=20+4L$$ volts where $$L$$ is the arc length in $$mm,$$ calculate the optimum length of arc for obtaining maximum arc power at welding. What voltage and current setting should be done on the power source for maximum arc power.
3
GATE ME 1989
MCQ (Single Correct Answer)
+1
-0.3
Crater wear always starts at some distance from the tool tip because at that point
A
cutting fluid does not penetrate
B
chip tool interface temp is maximum
C
normal stress on rake face is maximum
D
tool strength is minimu8m
4
GATE ME 1989
MCQ (Single Correct Answer)
+1
-0.3
The size of $$BLUE$$ in metal cutting increases with
A
very high speed
B
large uncut chip thickness
C
use of cutting fluid
D
increase in positive rake angle