1
GATE ME 2025
MCQ (Single Correct Answer)
+1
-0.33
In a laboratory experiment using a scaled down model to measure scour at a bridge pier, the Froude number is important. The ratio of the prototype length to the model length is 100 . If the velocity of the model is $1 \mathrm{~m} \mathrm{~s}^{-1}$, the velocity (in $\mathrm{m} \mathrm{s}^{-1}$ ) of the prototype is
2
GATE ME 2025
MCQ (More than One Correct Answer)
+2
-0
For a fully-developed pipe flow, which of the following options is/are correct?
3
GATE ME 2025
Numerical
+2
-0
A pitot tube connected to a U-tube mercury manometer measures the speed of air flowing in the wind tunnel as shown in the figure below. The density of air is $1.23 \mathrm{~kg} \mathrm{~m}^{-3}$ while the density of water is $1000 \mathrm{~kg} \mathrm{~m}^{-3}$. For the manometer reading of $h=30 \mathrm{~mm}$ of mercury, the speed of air in the wind tunnel is __________ $\mathrm{m} \mathrm{s}^{-1}$ (rounded off to 1 decimal place).
Assume: Specific gravity of mercury $=13.6$
Acceleration due to gravity $=10 \mathrm{~m} \mathrm{~s}^{-2}$

Your input ____
4
GATE ME 2025
Numerical
+2
-0
Consider a velocity field $\vec{V}=3 z \hat{i}+0 \hat{j}+C x \hat{k}$, where $C$ is a constant. if the flow is irrotational, the value of C is ________ (rounded off to 1 decimal place).
Your input ____
Paper analysis
Total Questions
Engineering Mathematics
10
Engineering Mechanics
1
Fluid Mechanics
5
Heat Transfer
4
Industrial Engineering
3
Machine Design
4
Production Engineering
12
Strength of Materials
5
Theory of Machines
5
Thermodynamics
6
Turbo Machinery
1
General Aptitude
9
More papers of GATE ME
GATE ME 2025
GATE ME 2024
GATE ME 2023
GATE ME 2022 Set 2
GATE ME 2022 Set 1
GATE ME 2020 Set 2
GATE ME 2020 Set 1
GATE ME 2019 Set 1
GATE ME 2019 Set 2
GATE ME 2018 Set 2
GATE ME 2018 Set 1
GATE ME 2017 Set 2
GATE ME 2017 Set 1
GATE ME 2016 Set 3
GATE ME 2016 Set 2
GATE ME 2016 Set 1
GATE ME 2015 Set 2
GATE ME 2015 Set 3
GATE ME 2015 Set 1
GATE ME 2014 Set 4
GATE ME 2014 Set 3
GATE ME 2014 Set
GATE ME 2014 Set 2
GATE ME 2014
GATE ME 2014 Set 1
GATE ME 2013
GATE ME 2012
GATE ME 2011
GATE ME 2010
GATE ME 2009
GATE ME 2008
GATE ME 2007
GATE ME 2006
GATE ME 2005
GATE ME 2004
GATE ME 2003
GATE ME 2002
GATE ME 2001
GATE ME 2000
GATE ME 1999
GATE ME 1998
GATE ME 1997
GATE ME 1996
GATE ME 1995
GATE ME 1994
GATE ME 1993
GATE ME 1992
GATE ME 1991
GATE ME 1990
GATE ME 1989
GATE ME 1988
GATE ME 1987
GATE ME
Papers
2025
2024
2023
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
1989
1988
1987