1
GATE ME 1999
MCQ (Single Correct Answer)
+2
-0.6
In computing Wilson’s economic lot size for an item, by mistake the demand rate estimate used was $$40\% $$ higher than the tree demand rate. Due to this error in the lot size computation, the total cost of setups plus inventory holding per unit time, would rise above the true optimum by approximately
A
$$1.4\% $$
B
$$6.3\% $$
C
$$18.3\% $$
D
$$8.7\% $$
2
GATE ME 1999
MCQ (Single Correct Answer)
+2
-0.6
At a production machine, parts arrive according to a Poisson process at the rate of $$0.35$$ parts per minute. Processing time for parts have exponential distribution with mean of $$2$$ minutes. What is the probability that a random part arrival finds that there are already $$8$$ parts in the system (in machine $$ + $$ in queue)?
A
$$0.0247$$
B
$$0.0576$$
C
$$0.0173$$
D
$$0.082$$
3
GATE ME 1999
MCQ (Single Correct Answer)
+1
-0.3
Which of the following materials requires the largest shrinkage allowance, while making a pattern for casting?
A
Aluminium
B
Brass
C
Cast Iron
D
Plain Carbon Steel
4
GATE ME 1999
Subjective
+5
-0
In a particular mold design, the down sprue has an area of Cross section of $$6.45\,\,c{m^2}$$ where the pouring basin leads into the sprue. The sprue is $$20$$ $$cm$$ long. The required metal flow rate at the top section of the sprue is $$820$$ $$c{m^3}/s.$$ Determine the pouring height necessary above the sprue top. Also determine the area of $$C.S$$ of sprue at its bottom to avoid the aspiration of liquid molten metal.