1
GATE CSE 1996
MCQ (Single Correct Answer)
+1
-0.3
The process state transition diagram in Figure is representative of GATE CSE 1996 Operating Systems - Process Concepts and Cpu Scheduling Question 65 English
A
a batch operating system
B
an operating system with a preemptive scheduler
C
an operating system with a non-preemptive scheduler
D
a uni-programmed operating system.
2
GATE CSE 1996
MCQ (Single Correct Answer)
+1
-0.3
Which of the following is an example of spooled device?
A
A line printer used to print the output of a number of jobs.
B
A terminal used to enter input data to a running program.
C
A secondary storage device in a virtual memory system.
D
A graphic display device.
3
GATE CSE 1996
MCQ (Single Correct Answer)
+2
-0.6
Four jobs to be executed on a single processor system arrive at time $${0^ + }$$ in the order $$A, B, C, D.$$ their burst $$CPU$$ time requirements are $$4, 1, 8, 1$$ time units respectively. The completion time of A under round robin scheduling with time slice of one time units.
A
$$10$$
B
$$4$$
C
$$8$$
D
$$9$$
4
GATE CSE 1996
MCQ (Single Correct Answer)
+1
-0.3
A critical section is a program segment
A
Which should run in certain specified amount of time
B
Which avoids deadlocks
C
Where shared resources are accessed
D
Which must be enclosed by a pair of semaphore operations, P and V
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12