1
GATE ME 2017 Set 2
Numerical
+1
-0
The standard deviation of linear dimensions $$P$$ and $$Q$$ are $$3\mu m$$ and $$4\mu m$$, respectively. When assembled, the standard deviation (in $$\mu m$$) of the following linear dimension $$(P+Q)$$ is ___________.
Your input ____
2
GATE ME 2017 Set 2
MCQ (Single Correct Answer)
+1
-0.3
For a single server with Poisson arrival and exponential service time, the arrival rate is $$12$$ per hour. Which one of the following service rates will provide a steady state finite queue length?
A
$$6$$ per hour
B
$$10$$ per hour
C
$$12$$ per hour
D
$$24$$ per hour
3
GATE ME 2017 Set 2
Numerical
+2
-0
A project starts with activity $$A$$ and ends with activity $$F.$$ The precedence relation and durations of the activities are as per the following table: GATE ME 2017 Set 2 Industrial Engineering - Pert and Cpm Question 9 English

The minimum project completion time (in days) is ___________

Your input ____
4
GATE ME 2017 Set 2
MCQ (Single Correct Answer)
+2
-0.6
A product made in two factories $$P$$ and $$Q,$$ is transported to two destinations, $$R$$ and $$S.$$ The per unit costs of transportation (in Rupees) from factories to destinations are as per the following matrix. GATE ME 2017 Set 2 Industrial Engineering - Transportation Question 4 English

Factory $$P$$ produces $$7$$ units and factory $$Q$$ produces $$9$$ units of the product. Each destination requires $$8$$ units. If the north-west corner method provides the total transportation cost as $$X$$ (in Rupees) and the optimized (the minimum) total transportation cost $$Y$$ (in Rupees), then $$(X$$-$$Y),$$ in Rupees, is

A
$$0$$
B
$$15$$
C
$$35$$
D
$$28$$