1
GATE EE 2019
MCQ (Single Correct Answer)
+1
-0.33
It takes two hours for a person X to mow the lawn. Y can mow the same lawn in four hours. How long (in minutes) will it take X and Y, if they work together to mow the lawn?
A
120
B
90
C
60
D
80
2
GATE EE 2019
MCQ (Single Correct Answer)
+1
-0.33
I am not sure if the bus that has been booked will be able to ______ all the students
A
deteriorate
B
accommodate
C
fill
D
sit
3
GATE EE 2019
MCQ (Single Correct Answer)
+2
-0.67
Given two sets X = {1, 2, 3} and Y = {2, 3, 4}, we construct a set Z of all possible fractions where the numerators belong to set X and the denominators belong to set Y. The product of elements having minimum and maximum values in the set Z is ____________.
A
$${1 \over {12}}$$
B
$${1 \over 8}$$
C
$${1 \over 6}$$
D
$${3 \over 8}$$
4
GATE EE 2019
MCQ (Single Correct Answer)
+1
-0.33
The passengers were angry __________ the airline staff about the delay.
A
on
B
about
C
with
D
towards
EXAM MAP
Medical
NEET
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
CBSE
Class 12