1
GATE CSE 2002
Subjective
+2
-0
Obtain the eigen values of the matrix $$$A = \left[ {\matrix{ 1 & 2 & {34} & {49} \cr 0 & 2 & {43} & {94} \cr 0 & 0 & { - 2} & {104} \cr 0 & 0 & 0 & { - 1} \cr } } \right]$$$
2
GATE CSE 2002
MCQ (Single Correct Answer)
+2
-0.6
The function $$f\left( {x,y} \right) = 2{x^2} + 2xy - {y^3}$$ has
A
Only one stationary point at $$(0, 0)$$
B
Two stationary points at $$(0, 0)$$ and $$\left( {{1 \over 6},{{ - 1} \over 3}} \right)$$
C
Two stationary points at $$(0, 0)$$ and $$(1, -1)$$
D
no stationary points.
3
GATE CSE 2002
MCQ (Single Correct Answer)
+1
-0.3
Which of the following scheduling algorithms is non-preemptive?
A
Round Robin
B
First-In First-Out
C
Multilevel Queue Scheduling
D
Multilevel Queue Scheduling with Feedback
4
GATE CSE 2002
Subjective
+2
-0
Draw the process state transition diagram of an $$OS$$ in which
(i) each process is in one of the five states: created, ready, running, blocked (i.e. sleep or wait), or terminated, and
(ii) only non-preemptive scheduling is used by the $$OS.$$ Label the transitions appropriately.
EXAM MAP
Medical
NEET
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
CBSE
Class 12