1
GATE CSE 2002
MCQ (Single Correct Answer)
+1
-0.3
Which of the following scheduling algorithms is non-preemptive?
A
Round Robin
B
First-In First-Out
C
Multilevel Queue Scheduling
D
Multilevel Queue Scheduling with Feedback
2
GATE CSE 2002
Subjective
+2
-0
Draw the process state transition diagram of an $$OS$$ in which
(i) each process is in one of the five states: created, ready, running, blocked (i.e. sleep or wait), or terminated, and
(ii) only non-preemptive scheduling is used by the $$OS.$$ Label the transitions appropriately.
3
GATE CSE 2002
MCQ (Single Correct Answer)
+2
-0.6
Which combination of the following features will suffice to characterize an $$OS$$ as a multi-programmed $$OS?$$
$$(a).$$ More than one program may be loaded into main memory at the same time for execution.
$$(b).$$ If a program waits for certain events such as $$I/O$$, another program is immediately scheduled for execution.
$$(c).$$ If the execution of a program terminates, another program is immediately scheduled for execution.
A
$$a$$
B
$$a$$ and $$b$$
C
$$a$$ and $$c$$
D
$$a, b$$ and $$c$$
4
GATE CSE 2002
MCQ (Single Correct Answer)
+1
-0.3
Which of the following scheduling algorithms is non-preemptive?
A
Round Robin
B
First-In-First-Out
C
Multilevel Queue Scheduling
D
Multilevel Queue Scheduling with feedback
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12