1
GATE CE 2024 Set 1
Numerical
+2
-0

A soil sample was consolidated at a cell pressure of 20 kPa and a back pressure of 10 kPa for 24 hours during a consolidated undrained (CU) triaxial test. The cell pressure was increased to 30 kPa on the next day and it resulted in the development of pore water pressure of 1 kPa. The soil sample failed when the axial stress was gradually increased to 50 kPa. The pore water pressure at failure was recorded as 21 kPa. The value of Skempton's pore pressure parameter B for the soil sample is ________________ (rounded off to 2 decimal places).

Your input ____
2
GATE CE 2024 Set 1
Numerical
+2
-0

The ordinates of a 1-hour unit hydrograph (UH) are given below.

Time (hours) 0 1 2 3 4 5
Ordinates of 1-hour UH (m3/s) 0 13 50 80 95 85
Time (hours) 6 7 8 9 10 11
Ordinates of 1-hour UH (m3/s) 55 35 15 10 3 0

These ordinates are used to derive a 3-hour UH. The peak discharge (in m3/s) for the derived 3-hour UH is ___________ (rounded off to the nearest integer).

Your input ____
3
GATE CE 2024 Set 1
Numerical
+2
-0

A spillway has unit discharge of 7.5 m3/s/m. The flow depth at the downstream horizontal apron is 0.5 m. The tail water depth (in meters) required to form a hydraulic jump is ___________ (rounded off to 2 decimal places).

Your input ____
4
GATE CE 2024 Set 1
MCQ (Single Correct Answer)
+1
-0.33

The following figure shows the arrangement of formwork for casting a cantilever RC beam.

GATE CE 2024 Set 1 Reinforced Cement Concrete - Workmenship and Fundamentals Question 2 English

The correct sequence of removing the Shores/Props is:

A

S1 → S2 → S3 → S4 → S5

B

S5 → S4 → S3 → S2 → S1

C

S3 → S2 → S4 → S1 → S5

D

S3 → S4 → S2 → S5 → S1

EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12