1
GATE CE 2002
MCQ (Single Correct Answer)
+1
-0.3
In natural water, hardness is mainly caused by
2
GATE CE 2002
MCQ (Single Correct Answer)
+2
-0.6
During a 6-hour storm the rainfall intensity was 0.8 cm/hr on a catchment of area 8.6 km2. The measured runoff volume during this period was 2,56,000 m3. The total rainfall was lost due to infiltration, evaporation and transpiration in cm/hr is
3
GATE CE 2002
Subjective
+5
-0
A $$10m$$ long prestressing bed is used to cast $$4$$ (pretensioned) prestressed concrete beams of $$2.3$$ $$m$$ each. A schematic representation of the bed is given in the following figure. The continuous prestressing reinforced is pulled at the end $$'Y'$$ of the bed through a distance of $$20$$ $$mm$$ to introduce the required prestress, before the concrete is cast. After the concrete has hardened, the prestressing reinforcement is cut at points $$A,B,C,D$$ and $$E.$$ Assume that the prestress is introduced without eccentricity, what is the loss in prestress on account of elastic deformation of concrete. Assume $${E_s} = 200000\,\,N/m{m^2},$$ reinforcement is $$500\,\,m{m^2},$$ size of beams $$ = 200\,\,mm\,\left( b \right) \times 400\,\,mm\,\left( h \right).$$
4
GATE CE 2002
MCQ (Single Correct Answer)
+2
-0.6
As per provision of $$IS$$ $$456$$-$$2000$$, in the limit state method for design of beams, the limiting value of the depth of neutral axis in a reinforced concrete beam of effective depth $$'d'$$ is given as
Paper analysis
Total Questions
Engineering Mathematics
8
Environmental Engineering
1
Hydrology
1
Reinforced Cement Concrete
4
Steel Structures
5
Strength of Materials Or Solid Mechanics
3
Structural Analysis
3
Transportation Engineering
1
More papers of GATE CE
GATE CE 2024 Set 2
GATE CE 2024 Set 1
GATE CE 2023 Set 2
GATE CE 2023 Set 1
GATE CE 2022 Set 2
GATE CE 2022 Set 1
GATE CE 2018 Set 1
GATE CE 2018 Set 2
GATE CE 2017 Set 1
GATE CE 2017 Set 2
GATE CE 2016 Set 2
GATE CE 2016 Set 1
GATE CE 2015 Set 2
GATE CE 2015 Set 1
GATE CE 2014 Set 1
GATE CE 2014 Set 2
GATE CE 2013
GATE CE 2012
GATE CE 2011
GATE CE 2010
GATE CE 2009
GATE CE 2008
GATE CE 2007
GATE CE 2006
GATE CE 2005
GATE CE 2004
GATE CE 2003
GATE CE 2002
GATE CE 2001
GATE CE 2000
GATE CE 1999
GATE CE 1998
GATE CE 1997
GATE CE 1996
GATE CE 1995
GATE CE 1994
GATE CE 1993
GATE CE 1992
GATE CE 1991
GATE CE 1990
GATE CE 1989
GATE CE 1988
GATE CE 1987
GATE CE
Papers
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
1989
1988
1987