1
GATE CSE 2014 Set 1
Numerical
+2
-0
Consider a $$6$$-stage instruction pipeline, where all stages are perfectly balanced. Assume that there is no cycle-time overhead of pipelining. When an application is executing on this $$6$$-stage pipeline, the speedup achieved with respect to non-pipelined execution if $$25$$% of the instructions incur $$2$$ pipeline stall cycles is________________.
Your input ____
2
GATE CSE 2014 Set 1
Numerical
+2
-0
A machine has a $$32$$-bit architecture, with $$1$$-word long instructions. It has $$64$$ registers, each of which is $$32$$ bits long. It needs to support $$45$$ instructions, which have an immediate operand in addition to two register operands. Assuming that the immediate operand is an unsigned integer, the maximum value of the immediate operand is ____________.
Your input ____
3
GATE CSE 2014 Set 1
Numerical
+2
-0
Consider two processors ܲ$${P_1}$$ and $${P_2}$$ executing the same instruction set. Assume that under identical conditions, for the same input, a program running on $${P_2}$$ takes $$25$$% less time but incurs $$20$$% more $$CPI$$ (clock cycles per instruction) as compared to the program running on ܲ$${P_1}$$ If the clock frequency of ܲ$${P_1}$$ is $$1GHz,$$ then the clock frequency of $${P_2}$$ (in $$GHz$$) is _____________.
Your input ____
4
GATE CSE 2014 Set 1
MCQ (Single Correct Answer)
+2
-0.6
Consider a hash table with 9 slots. The hash function is h(k) = k mod 9. The collisions are resolved by chaining. The following 9 keys are inserted in the order: 5, 28, 19, 15, 20, 33, 12, 17, 10. The maximum, minimum, and average chain lengths in the hash table, respectively, are
A
3, 0, and 1
B
3, 3, and 3
C
4, 0, and 1
D
3, 0, and 2
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12