Consider the following statements $(P)$ and $(Q)$ :
$(P):$ Fly ash and ground granulated blast furnace slag can be used as mineral admixtures in concrete.
(Q): As per IS 456:2000, the minimum moist curing period becomes higher when a mineral admixture is added to concrete.
Identify the CORRECT option from choices given below.
The figure shows a network diagram for a construction project. The activities $\mathrm{A}, \mathrm{B}, \mathrm{C}$, D, E, and F are represented by arrows and their durations are in the figure.
The total float available for the activity E in day(s) is equal to _________ (round off to the nearest integer).

For the matrix $[\mathrm{A}]$ given below, the transpose is $\qquad$ .
$$ [A]=\left[\begin{array}{lll} 2 & 3 & 4 \\ 1 & 4 & 5 \\ 4 & 3 & 2 \end{array}\right] $$
Integration of $\ln (x)$ with $x$ i.e.
$$ \int \ln (x) d x= $$__________