GATE CE 2023 Set 1
MCQ (Single Correct Answer)
+2
-0.66
A jet of water having a velocity of 20 m/s strikes a series of plates fixed radially on a wheel revolving in the same direction as the jet at 15 m/s. What is the percentage efficiency of the plates? (round off to one decimal place)
2
GATE CE 2023 Set 1
Numerical
+2
-0
A hydraulic jump occurs in a 1.0 m wide horizontal, frictionless, rectangular channel, with a pre-jump depth of 0.2 m and a post-jump depth of 1.0 m. The value of g may be taken as 10 m/s2. The values of the specific force at the pre-jump and post-jump sections are same and are equal to (in m3, rounded off to two decimal places) _____________ .
Your input ____
3
GATE CE 2023 Set 1
MCQ (Single Correct Answer)
+1
-0.33
The direct and reversed zenith angles observed by a theodolite are 56° 00' 00" and 303° 00' 00", respectively. What is the vertical collimation correction?
4
GATE CE 2023 Set 1
MCQ (Single Correct Answer)
+1
-0.33
A student is scanning his 10 inch × 10 inch certificate at 600 dots per inch (dpi) to convert it to raster. What is the percentage reduction in number of pixels if the same certificate is scanned at 300 dpi?
Paper analysis
Total Questions
Construction Material and Management
1
Engineering Mathematics
9
Environmental Engineering
8
Fluid Mechanics and Hydraulic Machines
5
Geomatics Engineering Or Surveying
3
Geotechnical Engineering
10
Hydrology
3
Irrigation
1
Reinforced Cement Concrete
3
Steel Structures
1
Strength of Materials Or Solid Mechanics
5
Structural Analysis
3
Transportation Engineering
3
General Aptitude
10
More papers of GATE CE
GATE CE 2024 Set 2
GATE CE 2024 Set 1
GATE CE 2023 Set 2
GATE CE 2023 Set 1
GATE CE 2022 Set 2
GATE CE 2022 Set 1
GATE CE 2018 Set 1
GATE CE 2018 Set 2
GATE CE 2017 Set 2
GATE CE 2017 Set 1
GATE CE 2016 Set 2
GATE CE 2016 Set 1
GATE CE 2015 Set 1
GATE CE 2015 Set 2
GATE CE 2014 Set 1
GATE CE 2014 Set 2
GATE CE 2013
GATE CE 2012
GATE CE 2011
GATE CE 2010
GATE CE 2009
GATE CE 2008
GATE CE 2007
GATE CE 2006
GATE CE 2005
GATE CE 2004
GATE CE 2003
GATE CE 2002
GATE CE 2001
GATE CE 2000
GATE CE 1999
GATE CE 1998
GATE CE 1997
GATE CE 1996
GATE CE 1995
GATE CE 1994
GATE CE 1993
GATE CE 1992
GATE CE 1991
GATE CE 1990
GATE CE 1989
GATE CE 1988
GATE CE 1987
GATE CE
Papers
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
1989
1988
1987