GATE CE 2017 Set 2
MCQ (Single Correct Answer)
+1
-0.3
Given that the scope of the construction work is well-defined with all its drawings, specifications, quantities and estimates, which one of the following types of contract would be most preferred?
A
EPC contract
B
Percentage rate contract
C
Item rate contract
D
Lump sum contract
2
GATE CE 2017 Set 2
MCQ (Single Correct Answer)
+2
-0.6
Consider the following statements:
P. Walls of one brick thick are measured in square meters.
Q. Walls of one brick thick are measured in cubic meters.
R. No deduction in the brickwork quantity is made for openings in walls up to 0.1 $$m^2$$ area.
S. For the measurement of excavation from the borrow pit in a fairly uniform ground, dead men are left at suitable intervals.
For the above statements, the correct option is
A
P-False; Q-True; R- False: S-True
B
P-False; Q-True: R-False; S-False
C
P-True; Q-False; R-True; S- False
D
P-True; Q-False; R-True; S-True
3
GATE CE 2017 Set 2
Numerical
+1
-0
For a construction project. The mean and standard deviation of the completion time are 200 days and 6.1 days, respectively. Assume normal distribution and use the value of standard normal deviate Z = 1.64 for the 95% confidence level. The maximum time required (in days) for the completion of the project would be __________.
Your input ____
4
GATE CE 2017 Set 2
MCQ (Single Correct Answer)
+1
-0.3
Consider the following simultaneous equations (with $${c_1}$$ and $${c_2}$$ being constants): $$$3{x_1} + 2{x_2} = {c_1}$$$ $$$4{x_1} + {x_2} = {c_2}$$$

The characteristic equation for these simultaneous equation is

A
$${\lambda ^2} - 4\lambda - 5 = 0$$
B
$${\lambda ^2} 4\lambda + 5 = 0$$
C
$${\lambda ^2} + 4\lambda - 5 = 0$$
D
$${\lambda ^2} + 4\lambda + 5 = 0$$
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12