1
GATE CE 2025 Set 1
MCQ (Single Correct Answer)
+1
-0.33
All the vehicles that come during a particular peak hour come during a 10-minute period within this hour. The 15 -minute peak hour factor for this peak hour is
2
GATE CE 2025 Set 1
MCQ (Single Correct Answer)
+1
-0.33
The maximum degree of the curve that can be used for railways in a mountainous region is
3
GATE CE 2025 Set 1
Numerical
+1
-0
Road A and Road B are joined by a circular horizontal curve of radius 200 m as shown in the figure. Road $A$ and Road $B$ are tangential to the curve at the points $C$ and $D$, respectively. Had the curve not been there, straight roads $A$ and $B$ would have met at the point $E$. The distance from $C$ to $E$ is 92 m . The value of angle $\theta$ (in degrees) is
__________ (rounded off to 1 decimal place).
Note: The value of angle .. is to be calculated only from the consideration of Euclidean geometry and the data given in the problem.
Your input ____
4
GATE CE 2025 Set 1
MCQ (Single Correct Answer)
+2
-0.67
The speed-density relation on a one-way, single lane road is shown in the figure, where speed $u$ is in km/hour and density $k$ is in vehicles/km. The maximum flow (in vehicles/hour) on this road is

Paper analysis
Total Questions
Construction Material and Management
5
Engineering Mathematics
10
Environmental Engineering
7
Fluid Mechanics and Hydraulic Machines
5
Geomatics Engineering Or Surveying
3
Geotechnical Engineering
8
Hydrology
4
Reinforced Cement Concrete
2
Steel Structures
1
Strength of Materials Or Solid Mechanics
2
Structural Analysis
4
Transportation Engineering
4
General Aptitude
10
More papers of GATE CE
GATE CE 2025 Set 1
GATE CE 2024 Set 2
GATE CE 2024 Set 1
GATE CE 2023 Set 2
GATE CE 2023 Set 1
GATE CE 2022 Set 2
GATE CE 2022 Set 1
GATE CE 2018 Set 2
GATE CE 2018 Set 1
GATE CE 2017 Set 2
GATE CE 2017 Set 1
GATE CE 2016 Set 2
GATE CE 2016 Set 1
GATE CE 2015 Set 1
GATE CE 2015 Set 2
GATE CE 2014 Set 2
GATE CE 2014 Set 1
GATE CE 2013
GATE CE 2012
GATE CE 2011
GATE CE 2010
GATE CE 2009
GATE CE 2008
GATE CE 2007
GATE CE 2006
GATE CE 2005
GATE CE 2004
GATE CE 2003
GATE CE 2002
GATE CE 2001
GATE CE 2000
GATE CE 1999
GATE CE 1998
GATE CE 1997
GATE CE 1996
GATE CE 1995
GATE CE 1994
GATE CE 1993
GATE CE 1992
GATE CE 1991
GATE CE 1990
GATE CE 1989
GATE CE 1988
GATE CE 1987
GATE CE
Papers
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
1989
1988
1987