1
GATE CE 2013
MCQ (Single Correct Answer)
+1
-0.3
The creep strains are
A
caused due to dead loads only
B
caused due to live loads only
C
caused due to cyclic loads only
D
independent of loads
2
GATE CE 2013
Numerical
+1
-0
As per $$IS$$ $$456:2000$$ for $$M20$$ grade concrete and plain barsin tension the design bond stress $${\tau _{bd}} = 1.2\,\,MPa.$$ Further, $$IS$$ $$456:2000$$ permits this design bond stress value to be increased by $$60\% $$ for $$HYSD$$ bars. The stress in the $$HYSD$$ reinforcing steel bars in tension $${\sigma _s} = 360\,MPa.$$ Find the required development length, $${L_d},$$ for $$HYSD$$ bars in terms of the bar diameter, $$\phi $$ ______________.
Your input ____
3
GATE CE 2013
MCQ (Single Correct Answer)
+1
-0.3
Maximum possible value of compaction factor for fresh (green) concrete is
A
0.5
B
1.0
C
1.5
D
2.0
4
GATE CE 2013
Numerical
+1
-0
A symmetric $${\rm I}$$-section (with width of each flange $$=50$$ $$mm$$, thickness of each flange $$=10$$ $$mm,$$ depth of web $$= 100$$ $$mm,$$ and thickness of web $$=10$$ $$mm$$ ݉݉) of steel is subjected to a shear force of $$100$$ $$kN.$$ Find the magnitude of the shear stress (in ܰ$$N/m{m^2}$$) in the web at its junction with the top flange. ___________
Your input ____
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12