1
GATE PI 2015
MCQ (Single Correct Answer)
+1
-0.3
In Computer Aided Process Planning, determination of process sequence for manufacture of any part design without predefined standard plans is known as
2
GATE PI 2015
MCQ (Single Correct Answer)
+2
-0.6
Match the linear transformation matrices listed in the first column to their interpretations in the second column.
3
GATE PI 2015
Numerical
+2
-0
In a Flexible manufacturing system, the Automated Guided Vehicles $$(AGV)$$ move at a speed of $$50$$ $$m/min,$$ cover an average distance of $$150$$ $$m$$ to deliver and $$100$$ $$m$$ for return. If the time required for pick-up and drop is $$30$$ $$s$$ each, neglecting idle times, then the number of $$AGV$$$$s$$ required to meet the demand of $$50$$ delivers per hour is ____________.
Your input ____
4
GATE PI 2015
Numerical
+1
-0
The maximum reduction per pass during wire drawing of an aluminium alloy ignoring friction and redundant work is $$77\% $$. The strain hardening exponent of the material is ______________.
Your input ____
Paper Analysis
Total Questions
Casting 2
Engineering Mathematics 8
Fluid Mechanics 1
Heat Transfer 1
Industrial Engineering 3
Joining of Materials 1
Machine Tools and Machining 10
Metal Forming 4
Metrology 2
Strength of Materials 4
Theory of Machines 1
Thermodynamics 1
More Papers of GATE PI
GATE PI 2017 GATE PI 2016 GATE PI 2015 GATE PI 2014 GATE PI 2013 GATE PI 2012 GATE PI 2011 GATE PI 2010 GATE PI 2009 GATE PI 2008 GATE PI 2007 GATE PI 2006 GATE PI 2005 GATE PI 2004 GATE PI 2003 GATE PI 2002 GATE PI 2001 GATE PI 1995 GATE PI 1994 GATE PI 1993 GATE PI 1992 GATE PI 1991 GATE PI 1990 GATE PI 1989
GATE PI Papers
All year-wise previous year question papers
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
1995
1994
1993
1992
1991
1990
1989