1
GATE PI 2015
MCQ (Single Correct Answer)
+1
-0.3
In Computer Aided Process Planning, determination of process sequence for manufacture of any part design without predefined standard plans is known as
2
GATE PI 2015
MCQ (Single Correct Answer)
+2
-0.6
Match the linear transformation matrices listed in the first column to their interpretations in the second column.
3
GATE PI 2015
Numerical
+2
-0
In a Flexible manufacturing system, the Automated Guided Vehicles $$(AGV)$$ move at a speed of $$50$$ $$m/min,$$ cover an average distance of $$150$$ $$m$$ to deliver and $$100$$ $$m$$ for return. If the time required for pick-up and drop is $$30$$ $$s$$ each, neglecting idle times, then the number of $$AGV$$$$s$$ required to meet the demand of $$50$$ delivers per hour is ____________.
Your input ____
4
GATE PI 2015
Numerical
+1
-0
The maximum reduction per pass during wire drawing of an aluminium alloy ignoring friction and redundant work is $$77\% $$. The strain hardening exponent of the material is ______________.
Your input ____
Paper analysis
Total Questions
Casting
2
Engineering Mathematics
8
Fluid Mechanics
1
Heat Transfer
1
Industrial Engineering
3
Joining of Materials
1
Machine Tools and Machining
10
Metal Forming
4
Metrology
2
Strength of Materials
4
Theory of Machines
1
Thermodynamics
1
More papers of GATE PI
GATE PI 2017
GATE PI 2016
GATE PI 2015
GATE PI 2014
GATE PI 2013
GATE PI 2012
GATE PI 2011
GATE PI 2010
GATE PI 2009
GATE PI 2008
GATE PI 2007
GATE PI 2006
GATE PI 2005
GATE PI 2004
GATE PI 2003
GATE PI 2002
GATE PI 2001
GATE PI 1995
GATE PI 1994
GATE PI 1993
GATE PI 1992
GATE PI 1991
GATE PI 1990
GATE PI 1989
GATE PI
Papers
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
1995
1994
1993
1992
1991
1990
1989