1
GATE PI 2015
MCQ (Single Correct Answer)
+2
-0.6
In a vertical piston-cylinder arrangement the force applied to the piston, pushes water through a nozzle as shown in the figure. The water flows out from the nozzle, and reaches the top of its trajectory. The kinetic and pressure energies at points $$(1), (2)$$ and $$(3),$$ respectively, are GATE PI 2015 Fluid Mechanics - Fluid Dynamics Question 2 English
A
(small and large), (large and zero) and (zero and zero)
B
(small and zero), (large and large) and (small and zero)
C
(large and zero), (zero and large) and (large and zero)
D
(large and small), (small and zero) and (small and large)
2
GATE PI 2015
Numerical
+2
-0
In a $$1$$ $$m$$ thick wall, the temperature distribution at a given instant is
$$T\left( x \right) = {c_0} + {c_1}x + {c_2}{x^2}$$ where $$T$$ is in $${}^ \circ C$$ and $$x$$ is in $$m.$$ The constants are: $${c_0} = {800^ \circ }C,$$ $${c_1} = - {250^ \circ }C/m$$ and $${c_2} = - {40^ \circ }C/{m^2}.$$ The thermal conductivity of the wall is $$50$$ $$W/mK$$ and wall area is $$5\,\,{m^2}.$$ If there is a heat source generating uniform volumetric heating at the rate of $$500$$ $$W/{m^3}$$ inside the wall, then the rate of change of energy storage in the wall, in $$kW,$$ is _____________.
Your input ____
3
GATE PI 2015
MCQ (Single Correct Answer)
+1
-0.3
A line balancing problem is solved in the context of
A
process layout
B
Fixed position layout
C
Product layout
D
production schedule
4
GATE PI 2015
Numerical
+2
-0
A manufacturing line requires $$7.2$$ minutes to make a product. The line has six workstations arranged as per the required sequence of operations. Total production required is $$300$$ products in $$7.5$$ hours. At steady state, the line efficiency, in $$\% $$, is ______________
Your input ____