1
GATE PI 1991
Fill in the Blanks
+1
-0
In spot welding of aluminium sheets, the welding current should be .........A........ and weld time should be kept ............B......... than for $$MS$$ sheet of same thickness.

(A). higher / lower, (B). higher / lower

2
GATE PI 1991
Fill in the Blanks
+1
-0
....................... is the non-fusion method of joining dissimilar metals with metals whose melting temp is greater than $${400^ \circ }C$$.
3
GATE PI 1991
Fill in the Blanks
+1
-0
Continuous rails for Indian railways are welded by ........ Welding process.
4
GATE PI 1991
MCQ (Single Correct Answer)
+2
-0.6
In welding process, penetration is increased by
A
increasing current and decreasing speed
B
decreasing both current and speed
C
increasing both arc voltage and speed
D
increasing arc voltage and decreasing
EXAM MAP
Medical
NEET
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
CBSE
Class 12