1
GATE PI 1991
MCQ (Single Correct Answer)
+1
-0.3
The optimum pouring time for a casting depends on several factors. One important factor among them is
A
location of riser
B
porosity of sand mold
C
fluidity of casting metal
D
area of the pouring basin
2
GATE PI 1991
Subjective
+6
-0
A rectangular block of steel $$C.S$$ $$100\,\, \times \,\,150mm$$ and $$250mm$$ height is to be cast with out any riser. The block is moulded entirely in the drag of a green sand flask & is tap gated. The cope of the flask is $$200mm$$ height & the height of the metal during pouring is $$100mm$$ above the cope level. A tapered sprue is employed & the gating ratio is $$1:4:2$$. Assume no energy losses in the system. The time taken (in seconds) to fill the casting cavity, if the tapered sprues with $$500$$ $$m{m^2}$$ exit area is used.
3
GATE PI 1991
Fill in the Blanks
+1
-0
Low permeability molds and low pouring temperature of the molten metal causes ......................... defect in castings.
4
GATE PI 1991
Fill in the Blanks
+1
-0
Pressure die casting deals with casting metals of relatively ............. A ............. melting point and provides ........ B.......... production rate.

A. higher / lower,$$\,\,\,\,\,\,\,\,\,\,$$ B. higher / lower

EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12