1
GATE PI 1991
Subjective
+6
-0
A rectangular block of steel $$C.S$$ $$100\,\, \times \,\,150mm$$ and $$250mm$$ height is to be cast with out any riser. The block is moulded entirely in the drag of a green sand flask & is tap gated. The cope of the flask is $$200mm$$ height & the height of the metal during pouring is $$100mm$$ above the cope level. A tapered sprue is employed & the gating ratio is $$1:4:2$$. Assume no energy losses in the system. The time taken (in seconds) to fill the casting cavity, if the tapered sprues with $$500$$ $$m{m^2}$$ exit area is used.
2
GATE PI 1991
Fill in the Blanks
+1
-0
Low permeability molds and low pouring temperature of the molten metal causes ......................... defect in castings.
3
GATE PI 1991
Fill in the Blanks
+1
-0
Pressure die casting deals with casting metals of relatively ............. A ............. melting point and provides ........ B.......... production rate.
A. higher / lower,$$\,\,\,\,\,\,\,\,\,\,$$ B. higher / lower
4
GATE PI 1991
MCQ (Single Correct Answer)
+1
-0.3
Ceramic slurry is used in making the molds for
Paper analysis
Total Questions
Casting
5
Joining of Materials
7
Machine Tools and Machining
8
Metal Forming
5
Metrology
4
More papers of GATE PI
GATE PI 2017
GATE PI 2016
GATE PI 2015
GATE PI 2014
GATE PI 2013
GATE PI 2012
GATE PI 2011
GATE PI 2010
GATE PI 2009
GATE PI 2008
GATE PI 2007
GATE PI 2006
GATE PI 2005
GATE PI 2004
GATE PI 2003
GATE PI 2002
GATE PI 2001
GATE PI 1995
GATE PI 1994
GATE PI 1993
GATE PI 1992
GATE PI 1991
GATE PI 1990
GATE PI 1989
GATE PI
Papers
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
1995
1994
1993
1992
1991
1990
1989