1
GATE PI 1991
MCQ (Single Correct Answer)
+2
-0.6
In welding process, penetration is increased by
A
increasing current and decreasing speed
B
decreasing both current and speed
C
increasing both arc voltage and speed
D
increasing arc voltage and decreasing
2
GATE PI 1991
MCQ (More than One Correct Answer)
+1
-0
High alloy steel components are preheated before welding for reducing
A
Heat affected zone
B
Total energy consumption
C
Total time of welding
D
Welding stresses
3
GATE PI 1991
Subjective
+5
-0
A resistance welder is rated at $$50$$ $$kVA,$$ at $$50\% $$ duty cycle. Secondary voltage is always constant at $$25$$ volts. If a job requires $$1500$$Amps current, determine the maximum welding time in a total cycle time of $$30$$$$secs$$.
4
GATE PI 1991
Fill in the Blanks
+1
-0
In spot welding of aluminium sheets, the welding current should be .........A........ and weld time should be kept ............B......... than for $$MS$$ sheet of same thickness.

(A). higher / lower, (B). higher / lower