In welding process, penetration is increased by
2
GATE PI 1991
MCQ (More than One Correct Answer)
+1
-0
High alloy steel components are preheated before welding for reducing
3
GATE PI 1991
Subjective
+5
-0
A resistance welder is rated at $$50$$ $$kVA,$$ at $$50\% $$ duty cycle. Secondary voltage is always constant at $$25$$ volts. If a job requires $$1500$$Amps current, determine the maximum welding time in a total cycle time of $$30$$$$secs$$.
4
GATE PI 1991
Fill in the Blanks
+1
-0
In spot welding of aluminium sheets, the welding current should be .........A........ and weld time should be kept ............B......... than for $$MS$$ sheet of same thickness.
(A). higher / lower, (B). higher / lower
Paper Analysis
Total Questions
Casting 5
Joining of Materials 7
Machine Tools and Machining 8
Metal Forming 5
Metrology 4
More Papers of GATE PI
GATE PI 2017 GATE PI 2016 GATE PI 2015 GATE PI 2014 GATE PI 2013 GATE PI 2012 GATE PI 2011 GATE PI 2010 GATE PI 2009 GATE PI 2008 GATE PI 2007 GATE PI 2006 GATE PI 2005 GATE PI 2004 GATE PI 2003 GATE PI 2002 GATE PI 2001 GATE PI 1995 GATE PI 1994 GATE PI 1993 GATE PI 1992 GATE PI 1991 GATE PI 1990 GATE PI 1989
GATE PI Papers
All year-wise previous year question papers
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
1995
1994
1993
1992
1991
1990
1989