1
GATE CSE 1993
Fill in the Blanks
+1
-0
The value of the double integral $$\int\limits_0^1 {\int\limits_x^{{1 \over x}} {{x \over {1 + {y^2}}}\,\,dx\,\,dy = \_\_\_\_\_.} } $$
2
GATE CSE 1993
Subjective
+2
-0
The details of an interrupt cycle are shown in Figure GATE CSE 1993 Operating Systems - Process Concepts and Cpu Scheduling Question 40 English
Given that an interrupt input arrives every $$1$$ $$msec,$$ what is the percentage of the total time that the $$CPU$$ devotes for the main program execution.
3
GATE CSE 1993
MCQ (Single Correct Answer)
+2
-0.6
Assume that the following jobs are to be executed on a single processor system.
Job Id CPU Burst Time
p 4
q 1
r 8
s 1
t 2

The jobs are assumed to have arrived at time $${0^ + }$$ and in the order $$p,q,r,s,t.$$ Calculate the departure time (completion time) for job $$p$$ if scheduling is round robin with time slice$$1.$$

A
$$4$$
B
$$10$$
C
$$11$$
D
$$12$$
4
GATE CSE 1993
MCQ (Single Correct Answer)
+2
-0.6
A part of the system software, which under all circumstances must reside in the main memory is:
A
text editor
B
assembler
C
linker
D
loader
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12