1
GATE CE 2010
MCQ (Single Correct Answer)
+2
-0.6
Ion concentrations obtained for a groundwater sample (having pH=8.1) are given
below.
Total hardness (mg/L as $$CaCO_3$$) present in the above water sample is
Ion | $$Ca^{2+}$$ | $$Mg^{2+}$$ | $$Na^+$$ | $$HCO_3^-$$ | $$SO_4^{2-}$$ | $$Cl^{-}$$ |
---|---|---|---|---|---|---|
Ionconcentration(mg/L) | 100 | 6 | 15 | 250 | 45 | 39 |
Atomic Weight | Ca=40 | Mg=24 | Na=23 | H=1,C=12,O=16 | S=32,O=16 | Cl=35.5 |
Total hardness (mg/L as $$CaCO_3$$) present in the above water sample is
2
GATE CE 2010
MCQ (Single Correct Answer)
+2
-0.6
The moisture holding capacity of the soil in a 100 hectare farm is 18 cm/m. the field is to
be irrigated when 50 percent of the available moisture in the root zone is depleted. The
irrigation water is to be supplied by a pump working for 10hours a day, and water
application efficiency is 75%. Details of crops planned for cultivation are as follows:
The area of crop Y that can be irrigated when the available capacity of irrigation
system is 40 liters/sec is
Crop | Root zone depth (m) | Peak rate of moisture use(mm/day) |
---|---|---|
X | 1.0 | 5.0 |
Y | 0.8 | 4.0 |
3
GATE CE 2010
MCQ (Single Correct Answer)
+2
-0.6
The moisture holding capacity of the soil in a 100 hectare farm is 18cm/m. the field is to
be irrigated when 50 percent of the available moisture in the root zone is depleted. The
irrigation water is to be supplied by a pump working for 10hours a day, and water
application efficiency is 75%. Details of crops planned for cultivation are as follows:
The capacity of irrigation system required to irrigate crop X in 36 hectares is
Crop | Root zone depth (m) | Peak rate of moisture use(mm/day) |
---|---|---|
X | 1.0 | 5.0 |
Y | 0.8 | 4.0 |
4
GATE CE 2010
MCQ (Single Correct Answer)
+2
-0.6
A doubly reinforced rectangular concrete beam has a width of $$300$$ $$mm$$ and an effective depth of $$500$$ $$mm.$$ the beam is reinforced with $$2200\,m{m^2}$$ of steel in tension and $$628\,m{m^2}$$ of steel in compression. The effective cover for compression steel is $$50$$ $$mm$$. Assume that both tension and compression steel yield. The grades of concrete and steel used are $$M20$$ and $$Fe250$$ respectively. The stress lock parameters (rounded off to first two decimal places) for concrete shall be as per IS $$456:200.$$
The moment of resistance of the section is
Paper analysis
Total Questions
Engineering Mathematics
10
Environmental Engineering
2
Irrigation
2
Reinforced Cement Concrete
2
Steel Structures
2
Strength of Materials Or Solid Mechanics
8
Structural Analysis
2
More papers of GATE CE
GATE CE 2024 Set 2
GATE CE 2024 Set 1
GATE CE 2023 Set 2
GATE CE 2023 Set 1
GATE CE 2022 Set 2
GATE CE 2022 Set 1
GATE CE 2018 Set 1
GATE CE 2018 Set 2
GATE CE 2017 Set 2
GATE CE 2017 Set 1
GATE CE 2016 Set 2
GATE CE 2016 Set 1
GATE CE 2015 Set 1
GATE CE 2015 Set 2
GATE CE 2014 Set 1
GATE CE 2014 Set 2
GATE CE 2013
GATE CE 2012
GATE CE 2011
GATE CE 2010
GATE CE 2009
GATE CE 2008
GATE CE 2007
GATE CE 2006
GATE CE 2005
GATE CE 2004
GATE CE 2003
GATE CE 2002
GATE CE 2001
GATE CE 2000
GATE CE 1999
GATE CE 1998
GATE CE 1997
GATE CE 1996
GATE CE 1995
GATE CE 1994
GATE CE 1993
GATE CE 1992
GATE CE 1991
GATE CE 1990
GATE CE 1989
GATE CE 1988
GATE CE 1987
GATE CE
Papers
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
1989
1988
1987