1
GATE PI 2005
MCQ (Single Correct Answer)
+2
-0.6
Consider the following statements:
In comparison to hot working, in cold working,
$$1.$$ Higher forces are required
$$2.$$ No heating is required
$$3.$$ Less ductility is required
$$4.$$ Better surface finish is obtained.
In comparison to hot working, in cold working,
$$1.$$ Higher forces are required
$$2.$$ No heating is required
$$3.$$ Less ductility is required
$$4.$$ Better surface finish is obtained.
Which of the statements given above are correct?
2
GATE PI 2005
MCQ (Single Correct Answer)
+2
-0.6
Assertion (A) : Cold working of metals result in increase of strength and hardness.
Reason (R) : Cold working reduces the total number of dislocations per unit volume of the material.
Reason (R) : Cold working reduces the total number of dislocations per unit volume of the material.
3
GATE PI 2005
MCQ (Single Correct Answer)
+2
-0.6
A round billet made of brass is to be extruded (extrusion constant $$=250$$ $$MPa$$ ) at $${700^ \circ }C.$$ The billet diameter is $$100$$ $$mm$$ and the diameter of the extrusion is $$50$$ $$mm.$$ The extrusion force required (in $$MN$$) is
4
GATE PI 2005
MCQ (Single Correct Answer)
+2
-0.6
A level having $${90^0}$$ bend is to be produced by drop forging using mild steel bar as raw material. The various operations to be performed on it during forging are:
$$P$$ - Cutting;
$$Q$$ - Bending;
$$R$$ - Fullering;
$$S$$ - Blocking cum finishing;
$$T$$ - Edgering
$$P$$ - Cutting;
$$Q$$ - Bending;
$$R$$ - Fullering;
$$S$$ - Blocking cum finishing;
$$T$$ - Edgering
The correct sequence for performing the operations is:
Questions Asked from Metal Forming Process (Marks 2)
Number in Brackets after Paper Indicates No. of Questions
GATE PI Subjects
Engineering Mechanics
Strength of Materials
Theory of Machines
Engineering Mathematics
Machine Design
Fluid Mechanics
Thermodynamics
Casting
Joining of Materials
Metal Forming
Machine Tools and Machining
Metrology
Industrial Engineering