Line Balancing · Industrial Engineering · GATE PI

Start Practice

Marks 1

GATE PI 2015
A line balancing problem is solved in the context of

Marks 2

GATE PI 2015
A manufacturing line requires $$7.2$$ minutes to make a product. The line has six workstations arranged as per the required sequence of operations. To...
EXAM MAP
Medical
NEET
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
CBSE
Class 12