Line Balancing · Industrial Engineering · GATE PI
Start PracticeMarks 1
GATE PI 2015
A line balancing problem is solved in the context of
Marks 2
GATE PI 2015
A manufacturing line requires $$7.2$$ minutes to make a product. The line has six workstations arranged as per the required sequence of operations. To...