1
GATE PI 2006
MCQ (Single Correct Answer)
+2
-0.6
A work piece of $$1000$$ $$mm$$ length and $$300$$ $$mm$$ width is machined by planning operation with a feed of $$0.3$$ $$mm/stroke.$$ The machine tool executes $$10$$ double strokes per minute. The planning time for a single pass is

A
$$50$$ $$min$$
B
$$100$$ $$min$$
C
$$166.66$$ $$min$$
D
$$333.33$$ $$min$$
2
GATE PI 2006
MCQ (Single Correct Answer)
+2
-0.6
It is required to punch a hole of diameter $$10mm$$ on a sheet of thickness $$3mm.$$ The shear strength of the work material is $$420Mpa.$$ The required punch force is
A
$$19.78$$ $$kN$$
B
$$39.56$$ $$kN$$
C
$$98.9$$ $$kN$$
D
$$395.6$$ $$kN$$
3
GATE PI 2006
MCQ (Single Correct Answer)
+2
-0.6
A solid cylindrical stainless steel work piece of $$200mm$$ diameter and $$150mm$$ height. This component is reduced by $$50\% $$ in height with flat die in open die forging. Assuming the flow stress of the material as $$1000$$ $$MPa$$ and the coefficient of friction to be $$0.2,$$ the estimated forging force at the end of the stroke is
A
$$20.8$$ $$kN$$
B
$$31$$ $$kN$$
C
$$78.6$$ $$kN$$
D
$$78.6$$ $$MN$$
4
GATE PI 2006
MCQ (Single Correct Answer)
+2
-0.6
A copper strip of $$200$$ $$mm$$ width and $$30$$ $$mm$$ thickness is to be rolled to a thickness of $$25$$ $$mm.$$ The roll of radius $$300$$ $$mm$$ rotates at $$100$$ $$rpm.$$ The average shear strength of the work material is $$180$$ $$MPa.$$ The roll strip contact length and the roll force are
A
$$15.8$$ $$mm$$ & $$0.59$$ $$MN$$
B
$$18.97$$ $$mm$$ & $$0.683$$ $$MN$$
C
$$38.73$$ $$mm$$ & $$1.395$$ $$MN$$
D
$$38.73$$ $$mm$$ & $$2.09$$ $$MN$$
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12