The potential production alternatives for manufacturing a product along with their unit cost and monthly capacity are given in the Table. GATE PI 2017 Industrial Engineering - Inventory Control Question 1 English

The inventory at the end of july is $$100$$ units. If the demand for the month of August is $$620,$$ then the minimum total cost (in Rs.) to meet the demand is ______________

Your input ____
2
GATE PI 2017
Numerical
+2
-0
In a project, tasks $$A, B, C, D, E, F, G, H, I$$ and $$J$$ are to be performed. The precedence relationships and the time required (in days) to complete the tasks are given in the Table. GATE PI 2017 Industrial Engineering - Pert and Cpm Question 1 English

The time required (in days) to complete the project along the critical path is ______________

Your input ____
3
GATE PI 2017
Numerical
+2
-0
In a calendar year, the demand forecast of motorbikes for the month of june is $$200.$$ The actual demand of motorbikes for the month of June and July are $$300$$ and $$350,$$ respectively. If single exponential smoothing method with smoothing constant $$0.7$$ is used, then the demand forecast for the month of August is ___________.
Your input ____
4
GATE PI 2017
MCQ (Single Correct Answer)
+1
-0.3
In gas tungsten arc welding process, the material coated on pure tungsten electrode to enhance its current carrying capacity is
A
Titanium
B
Manganese
C
Radium
D
Thorium