Two pipes of inner diameter $$100mm$$ and outer diameter $$110mm$$ each are joined by flash butt welding using $$30V$$ power supply. At the interface, $$1mm$$ of material melts from each pipe which has a resistance of $$42$$ Ohms.If the unit melt energy is $$64.4$$ $$MJ/{m^3}$$, then time required for welding (in $$S$$) is
A
$$1$$
B
$$5$$
C
$$10$$
D
$$20$$
2
GATE PI 2008
MCQ (Single Correct Answer)
+2
-0.6
Aluminium strips of $$2mm$$ thickness are joined together by resistance spot welding process by applying an electric current $$6000$$$$A$$ for $$0.15sec$$. The heat required for melting aluminium is $$2.9J/m{m^3}.$$ The diameter and thickness of the weld nugget are found to be $$5$$ $$mm$$ and $$2.5mm$$ respectively. Assuming the electrical resistance to be $$75$$ micro-ohms, the percentage of total energy utilized in forming the weld nugget is
A
$$28$$
B
$$35$$
C
$$65$$
D
$$72$$
3
GATE PI 2008
MCQ (Single Correct Answer)
+2
-0.6
Which pair among the following solid state welding processes uses heat from an external source
$$P$$- Diffusion welding
$$Q$$- Friction welding
$$R$$- Ultrasonic welding
$$S$$- Forge welding
A
$$P$$ & $$R$$
B
$$R$$ & $$S$$
C
$$Q$$ & $$S$$
D
$$P$$ & $$S$$
4
GATE PI 2007
MCQ (Single Correct Answer)
+2
-0.6
The $$DC$$ power source for arc welding has the characteristic $$3V + 1 = 240,$$ where $$V=$$ Voltage and $${\rm I}\,\, = $$ current in amp. For maximum arc power at the electrode, voltage should be set at
A
$$20V$$
B
$$40V$$
C
$$60V$$
D
$$80V$$
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12