1
GATE PI 2009
MCQ (Single Correct Answer)
+2
-0.6
Autogeneous gas tungsten arc welding of a steel plate is carried out with welding current of $$500A,$$ voltage of $$20V,$$ and weld speed of $$20mm/min.$$ Consider the heat transfer efficiency from the arc to the weld pool as $$90\% $$. The heat input per unit length (in $$kJ/mm$$) is
2
GATE PI 2008
MCQ (Single Correct Answer)
+2
-0.6
Which of the following powders should be fed for effective oxy-fuel cutting of stainless steel
3
GATE PI 2008
MCQ (Single Correct Answer)
+2
-0.6
Two pipes of inner diameter $$100mm$$ and outer diameter $$110mm$$ each are joined by flash butt welding using $$30V$$ power supply. At the interface, $$1mm$$ of material melts from each pipe which has a resistance of $$42$$ Ohms.If the unit melt energy is $$64.4$$ $$MJ/{m^3}$$, then time required for welding (in $$S$$) is
4
GATE PI 2008
MCQ (Single Correct Answer)
+2
-0.6
Aluminium strips of $$2mm$$ thickness are joined together by resistance spot welding process by applying an electric current $$6000$$$$A$$ for $$0.15sec$$. The heat required for melting aluminium is $$2.9J/m{m^3}.$$ The diameter and thickness of the weld nugget are found to be $$5$$ $$mm$$ and $$2.5mm$$ respectively. Assuming the electrical resistance to be $$75$$ micro-ohms, the percentage of total energy utilized in forming the weld nugget is
Questions Asked from Welding (Marks 2)
Number in Brackets after Paper Indicates No. of Questions
GATE PI Subjects
Engineering Mechanics
Strength of Materials
Theory of Machines
Engineering Mathematics
Machine Design
Fluid Mechanics
Thermodynamics
Casting
Joining of Materials
Metal Forming
Machine Tools and Machining
Metrology
Industrial Engineering