1
GATE PI 1991
MCQ (Single Correct Answer)
+1
-0.3
The optimum pouring time for a casting depends on several factors. One important factor among them is
A
location of riser
B
porosity of sand mold
C
fluidity of casting metal
D
area of the pouring basin
2
GATE PI 1991
Fill in the Blanks
+1
-0
Low permeability molds and low pouring temperature of the molten metal causes ......................... defect in castings.
3
GATE PI 1990
Fill in the Blanks
+1
-0
The problem of shrinkage cavity is more likely to occur while casting ......... A ............ B.......... a chill block

(A.) metal / plastic , (B.) with / without.

4
GATE PI 1990
MCQ (Single Correct Answer)
+1
-0.3
For casting of turbine blades made of high temp and high strength alloys, the most suitable process is
A
Die casting
B
Investment casting
C
Centrifugal casting
D
Slush casting
EXAM MAP