1
GATE PI 1991
Fill in the Blanks
+1
-0
Pressure die casting deals with casting metals of relatively ............. A ............. melting point and provides ........ B.......... production rate.
A. higher / lower,$$\,\,\,\,\,\,\,\,\,\,$$ B. higher / lower
2
GATE PI 1991
MCQ (Single Correct Answer)
+1
-0.3
The optimum pouring time for a casting depends on several factors. One important factor among them is
3
GATE PI 1991
MCQ (Single Correct Answer)
+1
-0.3
Ceramic slurry is used in making the molds for
4
GATE PI 1991
Fill in the Blanks
+1
-0
Low permeability molds and low pouring temperature of the molten metal causes ......................... defect in castings.
Questions Asked from Casting Process (Marks 1)
Number in Brackets after Paper Indicates No. of Questions
GATE PI 2017 (1)
GATE PI 2015 (1)
GATE PI 2014 (1)
GATE PI 2013 (1)
GATE PI 2011 (2)
GATE PI 2010 (1)
GATE PI 2009 (1)
GATE PI 2008 (1)
GATE PI 2006 (1)
GATE PI 2005 (1)
GATE PI 2004 (1)
GATE PI 2003 (1)
GATE PI 1995 (1)
GATE PI 1994 (1)
GATE PI 1992 (5)
GATE PI 1991 (4)
GATE PI 1990 (2)
GATE PI 1989 (5)
GATE PI Subjects
Engineering Mechanics
Strength of Materials
Theory of Machines
Engineering Mathematics
Machine Design
Fluid Mechanics
Thermodynamics
Casting
Joining of Materials
Metal Forming
Machine Tools and Machining
Metrology
Industrial Engineering