Brazing and soldering are
2
GATE PI 2014
Numerical
+2
-0
A $$CNC$$ instruction $$G91\,\,\,G01\,\,\,X30\,\,\,Y40\,\,\,F100$$ commands the movement of tool along the path at a feed rate of $$100mm/min$$ $$(G91$$-incremental format and $$G01$$-linear interpolation). The feed rate of the tool (in $$mm/min)$$ along the $$X$$ axis will be _______________
Your input ____
3
GATE PI 2014
MCQ (Single Correct Answer)
+2
-0.6
Each axis of $$NC$$ machine is driven by a stepper motor drive with a lead screw. The pitch of lead screw is $$p$$ $$mm.$$ The step angle of stepper motor per pulse input is $$\alpha $$ degrees/pulse. The ratio of gear drive in stepper motor drive is $$g$$(number of turns of the motor for each single turn of the lead screw). The number of pulses required to achieve a linear movement of $$x$$ $$mm$$ is
4
GATE PI 2014
MCQ (Single Correct Answer)
+1
-0.3
In an open loop, point-to-point controlled $$CN$$ drilling machine, a stepper motor, producing $$200$$ angular steps per revolution drives the table of a drilling machine by one angular step per each pulse generated by a pulse generator (shown in figure). Each angular step moves the table by one Basic Length Unit $$(BLU)$$ along $$X$$ axis with a lead screw having a pitch of $$4mm.$$ If the frequency of pulse generator is doubled, the $$BLU$$ will
Paper analysis
Total Questions
Casting
2
Engineering Mathematics
8
Joining of Materials
2
Machine Tools and Machining
7
Metal Forming
3
Metrology
1
More papers of GATE PI
GATE PI 2017
GATE PI 2016
GATE PI 2015
GATE PI 2014
GATE PI 2013
GATE PI 2012
GATE PI 2011
GATE PI 2010
GATE PI 2009
GATE PI 2008
GATE PI 2007
GATE PI 2006
GATE PI 2005
GATE PI 2004
GATE PI 2003
GATE PI 2002
GATE PI 2001
GATE PI 1995
GATE PI 1994
GATE PI 1993
GATE PI 1992
GATE PI 1991
GATE PI 1990
GATE PI 1989
GATE PI
Papers
2017
2016
2015
2014
2013
2012
2011
2010
2009
2008
2007
2006
2005
2004
2003
2002
2001
1995
1994
1993
1992
1991
1990
1989