1
GATE PI 1990
Fill in the Blanks
+1
-0
While rolling a strip the peripheral velocity of the roll is ..... A .... than the entry velocity of the strip and is ...... B .... the exit velocity of the strip
A. greater / less / equal to
B. greater than / less than / equal to
2
GATE PI 1989
MCQ (Single Correct Answer)
+1
-0.3
Collapsible tubes are made by
A
Drawing
B
spinning
C
Extrusion
D
Rolling
3
GATE PI 1989
MCQ (Single Correct Answer)
+1
-0.3
The blank diameter used in thread rolling will be
A
Equal to the major diameter of the thread
B
Equal to the pitch diameter of the thread
C
little higher than the minor diameter of the thread
D
little higher than the pitch diameter of the thread
4
GATE PI 1989
Fill in the Blanks
+1
-0
At the last hammer stroke the excess material from the finishing cavity of a forging die is pushed into .............
EXAM MAP
Medical
NEETAIIMS
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
Civil Services
UPSC Civil Service
Defence
NDA
Staff Selection Commission
SSC CGL Tier I
CBSE
Class 12