1
GATE PI 1991
Fill in the Blanks
+1
-0
Seamless long steel tubes are manufactured by rolling, drawing and .............
2
GATE PI 1990
MCQ (Single Correct Answer)
+1
-0.3
Semi brittle materials can be extruded by
3
GATE PI 1990
Fill in the Blanks
+1
-0
While rolling a strip the peripheral velocity of the roll is ..... A .... than the entry velocity of the strip and is ...... B .... the exit velocity of the strip
A. greater / less / equal to
B. greater than / less than / equal to
A. greater / less / equal to
B. greater than / less than / equal to
4
GATE PI 1989
MCQ (Single Correct Answer)
+1
-0.3
Collapsible tubes are made by
Questions Asked from Metal Forming Process (Marks 1)
Number in Brackets after Paper Indicates No. of Questions
GATE PI Subjects
Engineering Mechanics
Strength of Materials
Theory of Machines
Engineering Mathematics
Machine Design
Fluid Mechanics
Thermodynamics
Casting
Joining of Materials
Metal Forming
Machine Tools and Machining
Metrology
Industrial Engineering