High alloy steel components are preheated before welding for reducing
2
GATE PI 1991
Fill in the Blanks
+1
-0
In spot welding of aluminium sheets, the welding current should be .........A........ and weld time should be kept ............B......... than for $$MS$$ sheet of same thickness.
(A). higher / lower, (B). higher / lower
3
GATE PI 1991
Fill in the Blanks
+1
-0
Continuous rails for Indian railways are welded by ........ Welding process.
4
GATE PI 1991
Fill in the Blanks
+1
-0
....................... is the non-fusion method of joining dissimilar metals with metals whose melting temp is greater than $${400^ \circ }C$$.
Questions Asked from Welding (Marks 1)
Number in Brackets after Paper Indicates No. of Questions
GATE PI Subjects
Engineering Mechanics
Strength of Materials
Theory of Machines
Engineering Mathematics
Machine Design
Fluid Mechanics
Thermodynamics
Casting
Joining of Materials
Metal Forming
Machine Tools and Machining
Metrology
Industrial Engineering