Linear Measurements and Chain Survey · Geomatics Engineering Or Surveying · GATE CE

Start Practice

Marks 1

GATE CE 1991
The length of a baseline measured on ground at an elevation of 300m above mean sea level is 2250 m. The required correction to reduce to sea level len...
GATE CE 1990
The required slope correction for a length of 60m, along a gradient of 1 in 20 is
EXAM MAP
Medical
NEET
Graduate Aptitude Test in Engineering
GATE CSEGATE ECEGATE EEGATE MEGATE CEGATE PIGATE IN
CBSE
Class 12